Browse All Projects

Explosive Ordnance Disposal Facility MacDill Air Force Base

Tampa, Florida

Market Sector

Federal

Type

Planning and Programming

Services Provided

Structural Engineering, Mechanical and Electrical Engineering/ESD, Program Management, Planning, Architecture

Region

Americas

As part of its contract with the U.S. Army Corp of Engineers, Mobile District, TYLI was retained to provide Project Programming and RFP Development for the design-build construction of an Explosive Ordnance Disposal (EOD) Facility at MacDill Air Force Base in Tampa, Florida.

The fast-track project comprised building design and site development, including utilities and supporting facilities. TYLI met all EOD facility requirements, resulting in a durable, low-maintenance building with the most efficient and functional layout, highest energy efficiency, and low operating costs.

Project Highlights:

  • TYLI’s project oversight included all architecture, structural engineering, civil engineering, mechanical and electrical engineering, and fire protection engineering services.
  • The EOD facility accommodates 18 full-time personnel and three government vehicles, with spaces for administrative offices and training, conditioned storage/shops areas, and garage bays for private- and government-owned vehicles.
  • Site improvements included paved parking with an area for a required turning radius.
  • Administrative areas called for private and open office areas in a standard office environment. The training and maintenance areas met special requirements specific to the EOD facility’s needs.