Rehabilitation of Boca del Cerro Bridge
Work scope
Refurbishment and adaptation for change of use project.
Property: Government of Mexico.
Builder: Consorcio LAMAT. Mota-Engil.
Technical Data
Steel arch built in 1950 with concrete approach spans. Mixed road and rail traffic.
Overall length: 190 m.
Span length: 20+150+20 m.
Pathologies: Steel structure: localized loss of material in some elements and corrosion. Concrete structure: cracking and superficial damage.
Repair actions: Strengthening of steel elements and repair of the steel and concrete structures. Replacement of the railroad area with a new pedestrian platform, as the railway traffic on the bridge disappears.