Projects

Archidona Viaduct

Archidona Viaduct

Málaga
Spain
Archidona Viaduct

Work Scope

Detailed Design Project Management

Property: ADIF (National Railway Infrastructure Management Bureau)

Builder: Dragados + AZVI

Ending Year: 2012

 

Technical Data

High-speed composite steel & composite viaduct. Twin girder with double composite action. Only one fixed point located in the middle of the viaduct (delta-shaped pier) and expansion joints at the abutment

Overall length: 3150 m.

Span lengths: 35+29x50+2x65+30x50+35 m.

Width: 14 m.

Maximum piers height: 32 m.

World record length without joints or expansion joints in track in High Speed.