Archidona Viaduct
Work Scope
Detailed Design Project Management
Property: ADIF (National Railway Infrastructure Management Bureau)
Builder: Dragados + AZVI
Ending Year: 2012
Technical Data
High-speed composite steel & composite viaduct. Twin girder with double composite action. Only one fixed point located in the middle of the viaduct (delta-shaped pier) and expansion joints at the abutment
Overall length: 3150 m.
Span lengths: 35+29x50+2x65+30x50+35 m.
Width: 14 m.
Maximum piers height: 32 m.
World record length without joints or expansion joints in track in High Speed.