Arroyo las Piedras Viaduct
Work Scope
Detailed Design and Project Management
Property: ADIF (National Railway Infrastructure Management Bureau)
Builder: Altec
Ending Year: 2006
Technical Data
First composite steel & concrete high speed viaduct in Spain. Composite steel & concrete twin girder cross-section with laxer concrete slab (double composite action) at hogging sections
Overall length: 1208,90 m.
Span lengths: 50.40+17x63.50+44+35 m.
Width: 14 m.
Maximum piers height: 93 m.