Madrid-Sevilla High Speed Rail Line Improvement Project

Madrid-Sevilla High Speed Rail Line Improvement Project

Madrid-Sevilla
Spain
Madrid-Sevilla

Work Scope

Inspection and rehabilitation projects for the integral improvement of 190 structures of the Madrid-Sevilla HSRL

Property: ADIF (Railway Infraestructure Manager)

Ending Year: 2022

 

Technical Data

Post-tensioned concrete viaducts and beam bridges, pre-cast concrete arch bridges and underpasses

Total length: 11,750 m.

Span lengths: Up to 52 m.

Width: Variable. 11.60 m the viaducts and up to 180 m the underpasses.