Mexico-Toluca Intercity Train, Viaducts 2 and 4
Work Scope
Detailed Design and Construction Engineering
Property: Transportations and Communications Bureau of Mexico
Builder: OHL/La Peninsular
Ending Year: 2021
Technical Data
The post-tensioner concrete box girder deck was built by the Movable Scaffolding System. Seismic isolation system based on hydraulic dampers.
Viaduct 2: 2234,9 m; Span lengths Typical Span 55 m; Maximum piers height 52 m
Viaduct 4: 1448 m; Span lengths Typical Span 64 m; Maximum piers height 74,50 m.
Width: 11,50 m