Nalón River Viaduct
Work Scope
Detailed Design, Constructive Engineering and Construction Support to the Contractor
Property: Asturias Local Goverment. Transport and Environmental Bureau
Builder: FCC Construccción S.A. & Alvargonzález Constructoras S.A.
Ending Year: 2007
Technical Data
Two hybrid viaducts with a central composite steel and concrete span consisting of a twin girder cross section and lateral prestressed concrete spans
Overall length: 165 m.
Span lengths: 27.50+110+27.50 m.
Width: 11.50 m per platform (two parallel decks).