New Boca del Cerro Viaduct
Work Scope
Study of solutions, Detailed Design and Technical Assistance during Execution.
Property: Gobierno de Mexico. Tren Maya. Fonatur.
Builder: LAMAT Consortium. Mota-Engil.
Ending Year: 2023
Technical Data
Hybrid bridge with lateral span in concrete box girder and central span with a truss with double composite (steel and concrete) action.
Span lengths: 30+160+30 m.
Width: 8,40 m.
The New Boca del Cerro Viaduct has been selected as a finalist for the 2024 IABSE Awards in the category of Small Road and Railway Bridges.