Viaduct Over Genil River
Work Scope
Detailed Design, Construction Engineering and Construction Support to the Contractor
Property: Spanish Ministry of Public Works. Railway Bureau
Builder: ACS
Ending Year: 2003
Technical Data
Symple-supported, Prestressed concrete box girder spans, ereted with self-bearing falsework
Overall length: 1389.80 m
Span lengths: 29x48 m
Width: 14 m