Vigo Airport and IFEVI Footbridge

Work Scope
Detailed Design and Construction Management
Property: Spanish Ministry of Public Works
Builder: Copasa
Ending Year: 2015
Technical Data
Simple-supported steel girder
Overall length: 280.52 m
Span lengths: 84+28.43+24.48+34.60+2x27.31+40+19.52+34.21+35.42
Width: 2.97 m