Search
Project
Wastewater
Nutrients and Emerging Contaminants
Treatment Facilities
Biosolids and Energy
United States
Due to the severe eutrophication (hypoxic zone) in the Gulf of Mexico, the Metropolitan Water Reclamation District of Great Chicago (District) is facing a progressively more stringent limits on
Project
Wastewater
Nutrients and Emerging Contaminants
Treatment Facilities
United States
In collaboration with Greeley and Hansen, the City negotiated with Virginia DEQ to set favorable nutrient WLAs that are based on total nitrogen and total phosphorus concentrations of 8.0 mg/L and 0.5
Project
Commercial
Office
Retail
United States
The East End Parking Garage is a five-level, cast-in-place, post-tensioned concrete structure constructed in 1983, with a south addition built in 1991. It provides parking for approximately 1,300
Project
Wastewater
Nutrients and Emerging Contaminants
Treatment Facilities
United States
The master planning effort provided the opportunity to repurpose existing unused tankage that once comprised the first stage of a two-stage activated sludge plant. This included the conversion of
Project
Wastewater
Treatment Facilities
United States
As part of Buffalo’s approved Combined Sewer Overflow Long Term Control Plan, the Buffalo Sewer Authority committed to increasing the wet weather capacity of the treatment facility to 560 MGD through
Project
Drinking Water
Desalination
Treatment Plants
United States
The purpose of the feasibility study of the desalination treatment system was to identify the most feasible solution of providing a sustainable potable water source for the City of Avalon, California
Project
Drinking Water
Desalination
Treatment Plants
Ecuador
The City of Guayaquil sought to guarantee the supply of drinking water for the urban population of the Puna Island, which is located south of the city on the Guayas River Gulf. The island was
Project
Drinking Water
Desalination
Treatment Plants
Wastewater
Nutrients and Emerging Contaminants
United States
Greeley and Hansen assisted San Jose Water with a third-party review of the water quality section within an in-development report which included the evaluation of the assumptions, calculations