3 Arch footbridges at the Cycling Green Ring
Work Scope
Detailed Design, Construction Engineering and Construction Support to the Contractor
Property: Madrid City Council
Builder: Acciona
Ending Year: 2007
Technical Data
Steel bowstring arch footbridge
Footbridge over N-II Highway: 150 m length; Main span: 80 m
Footbridge over N-VI Highway: 158.86 m length; Main span 60 m
Footbridge over Castille Highway: 260.96 m length; Main span 52 m
Width: Between 5-6 m