Projects

3 Arch footbridges at the Cycling Green Ring​

3 Arch footbridges at the Cycling Green Ring​

Madrid
Spain
3 Arch footbridges at the Cycling Green Ring​

Work Scope

Detailed Design, Construction Engineering and Construction Support to the Contractor

Property: Madrid City Council

Builder: Acciona

Ending Year: 2007

 

Technical Data

Steel bowstring arch footbridge

Footbridge over N-II Highway: 150 m length; Main span: 80 m​

Footbridge over N-VI Highway: 158.86 m length; Main span 60 m​

Footbridge over Castille Highway: 260.96 m length; Main span 52 m​

Width: Between 5-6 m​