Metro L-1, Ensanche de Vallecas Coach Depots
Work Scope
Detailed Design (including foundations and civil engineering works of machinery and facilities) and Construction Management
Property: MINTRA
Builder: Copasa-Sando
Ending Year: 2006
Technical Data
Steel and precast concrete structures.
Built Area: 65,000 m2
Forged: Precast and cast-in-place concrete structure.