Quito Metro Underground Stations and Tunnels
Work Scope
Phase I/II: Draw-up of seismic design guidelines. Optimized Structural Design. Value engineering, Detailed Design and Construction Management
Builder: Acciona infraestructuras
Ending Year: 2021
Technical Data
Underground structure in high sismicity area. Reinforced concrete retaining walls and floor slabs. Construction procedure "cut and cover"
Length: 22 km, 17 stations, 1 coach depot.
Forged: Reinforced concrete slabs.