Typical Fly-Overs on the Highway AP-36​

Typical Fly-Overs on the Highway AP-36​

Valencia
Spain
Typical Fly-Overs on the Highway AP-36​

Work Scope

Detailed Design, Constructive Engineering and Construction Support to the Contractor​

Property: Spanish Ministry of Public Works

Builder: Ferrovial-Agromán

Ending Year: 2006

 

Technical Data

Continuous precast concrete box girders​

Overall lengths:

Bridge Type 1 step:  64.60 m; Span 13.30+38+13.30 m

Bridge Type 2 step:  75 m; Span 18.50+38+18.50 m

Bridge Type 3 step:  65.50 m; Span 13.50+38.50+13.50 m

Bridge Type 12 step:  72 m; Span12+42+12 m

Bridge Type 7 step structure:  101.80 m; Span 18+30.80+35+18 m​

Width: Between 8 y 18 m​