Typical Fly-Overs on the Highway AP-36
Work Scope
Detailed Design, Constructive Engineering and Construction Support to the Contractor
Property: Spanish Ministry of Public Works
Builder: Ferrovial-Agromán
Ending Year: 2006
Technical Data
Continuous precast concrete box girders
Overall lengths:
Bridge Type 1 step: 64.60 m; Span 13.30+38+13.30 m
Bridge Type 2 step: 75 m; Span 18.50+38+18.50 m
Bridge Type 3 step: 65.50 m; Span 13.50+38.50+13.50 m
Bridge Type 12 step: 72 m; Span12+42+12 m
Bridge Type 7 step structure: 101.80 m; Span 18+30.80+35+18 m
Width: Between 8 y 18 m